Measuring breakdown parameters is increasingly required to predict a device’s safe region of operation. Sometimes, those breakdown conditions in reliability testing and breakdown test occur as a result of unexpected behaviors, such as a second breakdown. Physical damage to the test environment, such as a wafer burn mark, a melted probe-card needle, or other equipment damage, can also lead to breakdown problems. This application note outlines the various causes of these unexpected behaviors and how to prevent them.
Contact us
Call
Call us at
Available 6:00 AM – 5:00 PM (PST) Business Days
Download
Download Manuals, Datasheets, Software and more:
Feedback