與我們聯絡

與 Tek 業務代表即時對談。 上班時間:上午 6:00 - 下午 4:30 (太平洋時間)

致電

請致電

與 Tek 業務代表即時對談。 上班時間:上午 8:30 - 下午 5:30 (太平洋時間)

下載

下載手冊、產品規格表、軟體等等:

下載類型
機型或關鍵字

意見回饋

After I run the wizard and complete the steps/test is the fixture de-embedded?

問題:

After I run the wizard and complete the steps/test is the fixture de-embedded?

答案:

Yes, because the reference standards include the same loss as the DUT traces.

Note: if Autoset timebase is enabled (by default), then the TDT delay through the first DUT is used to set the time/div scale.  But if the DUT has high loss and/or poor frequency response, the autoset may have trouble.  In that case, recommend measuring the thru cal trace (if available) as the first DUT.  If through cal trace not available, recommend setting the timebase manually (on the Wizard, before clicking start). That will help the Wizard get the right timebase setting, and it also provides a "sanity check" because the S21 should be very close to zero.


此常見問答集適用於:

沒有任何產品系列

產品:

常見問答集 ID 59076

檢視所有常見問答集 »