Frage:
When should I run SPC?
Antwort:
Signal Path Compensation (SPC) can be run at any time. The best times to run SPC are:
- After the oscilloscope has been powered on and has warmed up for 20 minutes or more.
- If the temperature has changed more than 5 degrees C since the last SPC was run.
- Prior to making a critical measurement.
Diese FAQs beziehen sich auf:
Produktreihe DPO7000 Mixed-Signal-/Digital-Phosphor-Oszilloskope MSO/DPO70000DX MSO3000/DPO3000 MSO4000/DPO4000 Mixed-Signal-Oszilloskop MSO/DPO5000B
Produkt:
FAQ-ID 60156
Alle FAQs ansehen »