與我們聯絡

與 Tek 業務代表即時對談。 上班時間:上午 6:00 - 下午 4:30 (太平洋時間)

致電

請致電

與 Tek 業務代表即時對談。 上班時間:上午 8:30 - 下午 5:30 (太平洋時間)

下載

下載手冊、產品規格表、軟體等等:

下載類型
機型或關鍵字

意見回饋

I have VXI mainframe with a GPIB-VXI/C GPIB controller. Some of the instruments in this mainframe fail to initialize properly. What can I do to solve this problem?

問題:

I have VXI mainframe with a GPIB-VXI/C GPIB controller. Some of the instruments in this mainframe fail to initialize properly. What can I do to solve this problem?

答案:

The VXI specification requires instruments to be ready within 5 seconds of power-up. Some instruments are sensitive to this timing. Current model GPIB-VXI/C Slot 0 modules are shipped with the delay set to appromimately 2 seconds. Therefore, RESMAN runs as soon as the Slot 0 is ready. This setting may cause initialization problems for some instruments. The solution is simply to increase the delay time to a setting of 5 seconds. This holds of the running of RESMAN allowing all the modules to be ready for it to run.

Information on how to perform this change is provided in the "Change Configuration Information" paragraph of section 4 in the National Instruments GPIB-VXI/C User Manual. These are the basic steps to make the needed changes.Information on how to perform this change is provided in the "Change Configuration Information" paragraph of section 4 in the National Instruments GPIB-VXI/C User Manual. These are the basic steps to make the needed changes.

  1. Connect an ANSI terminal or emulation program to the Slot-0 serial port.
  2. Set the communication protocol for 9600,8,N,1.
  3. Power up the VXIbus mainframe.
  4. At the prompt, enter "CONF."
  5. Select #3.
  6. Select #3.
  7. Change delay time to 5 (or what ever you prefer).
  8. Select "Q."
  9. Select #5.
  10. Select #6.

此常見問答集適用於:

沒有任何產品系列

產品:

常見問答集 ID 61896

檢視所有常見問答集 »